Sunday, 2 February 2020

3,450 metre of Padma Bridge visible as 23rd span installed

The 23rd span of the much-awaited Padma Multipurpose Bridge was installed on Sunday at Jajira point, making over 3.30km out of total 6.15km of the main structure of the bridge visible.

Bangla News