RisingBD.Com
Online News Portal In Bangladesh
Sunday, 3 May 2020
Padma Bridge’s 29th span installed
The 29th span of the 6.15-kilometre long Padma Bridge was installed on the 19th and 20th pillars at Mawa point in Munshiganj on Monday morning.
Bangla News
Newer Post
Older Post
Home